site stats
100 MW / 200 MWh of Megapacks have been delivered and installed at Cheviré site, located in the port of Nantes. The facility will be operated by Autobidder and will be the France’s first large-scale 2-hour battery system📷
发布时间:
1
数据加载中
Markdown支持
评论加载中...
您可能感兴趣的: 更多